Location:
Total length of the line in all three parts is 820 km-Third part: Sarcheshmeh-Industries of Yazd Province-Second part : Golgohar- Sarcheshmeh-First part: Bandarabbas-Golgohar
Activity:
Water Supply
Client:
(Persian Gulf Water Supply and Transmission Co.(WASCO
start date:
Completion Date:
Project Description:
Services: Study, design & supervision on execution and operation of the project and also contractor's management
objectives: Water Supply of 110 MCM per year to south east of Iran's industries by desalination of sea water. this project would provide part of water demand of Gol-Gohar Mining and industrial complex, national Iranian Copper Industries Co.and Chadormalu Mining &Industrial Co.
`Fist Part Specifications:
Capacity: 4 m3/s
Start & End points: Bandarabbas- Golgohar
Pipe Material and Diamaeter: steel , 1600 mm
Pipeline Length: 300 KM
Power Consumption:145 MW
Numer of Pump Station:7 stations (42 electro pumps)
Interior coating :epoxy
Exterior coating :3 layers poly ethylene
Start & End Levels : 0 & 1800 m from sea level
Length of Hajiabad tunnel:1800 m with 9 m diameter
Status: under construction
Second Part Specifications :
Capacity: 2.7 m3/s
Start & End points: Golgohar- Mes Sarcheshmeh
Pipe Material and Diamaeter: steel , 1400 mm & 1500 mm
Pipeline Length: 150 KM
Power Consumption:40 MW
Numer of Pump Station:4 stations (25 electro pumps)
Interior coating :epoxy
Exterior coating :3 layers poly ethylene
Start & End Levels : 1800 & 2750 m from sea level
Length of Hajiabad tunnel:1800 m with 9 m diameter
Status: under construction
Third Part Specifications :
Capacity: 1.5 m3/s
Start & End points: Mes Sarcheshmeh- Chandormaloo mine and steel Ardakan Complex
Pipe Diamaeter: 900
mm & 1200 mm
Pipe Material : steel & GRP
Main Pipeline Length: 370 KM
Length of
Chandormaloo Branch : 160 km
Power Consumption:3 MW
Interior coating :epoxy
Exterior coating :3 layers poly ethylene
Start & End Levels : 2770 & 1158 m (gravity)
Length of Hajiabad tunnel:1800 m with 9 m diameter
Status: under construction