Location:
Northern Afghanistan, Southern Tajikistan and East Southern of
Activity:
Dams and Water Resources
Client:
Khorasan Razavi Regional Water Company
start date:
Completion Date:
Project Description:
Service Type: Recognition
Subject: Feasibility Comprehensive Study of the of Water
Transmission from Amu Darya River to
Iran
Studies Topics:
General and administrative
Proceedings
The basic studies include
physiographic, basic drawings, meteorology and hydrology; socio-economic, water
needs of agriculture and water consumption, and provide the resources features
as well as uses of water
Hydro- Geopolitics and
environmental studies include survey of legal regimes and legal environment and
provide the best operating model for provide and water supply of the Amu Darya
.
Technical studies including the
general design options and geological engineering
Executive solutions to continue
studies and project implementation, including the appropriate Financial - Legal
model for the implementation of projects and Action Plan submission to continue
the design and implementation of the project
Aspects of initial designs : The implementation of
the Diversion Dam and Intake Structures of origin, Three water transmission
steel pipe line construction of 800 km with a diameter of 2500 mm,construction
of pumping stations, reservoirs and structures needed on the road route.
Studies Start Date: March 2014
Scheduled
completion date of the project: March 2015