Location:
Tehran
Activity:
Sewerage Systems and Environment
Client:
Tehran Sewerage Co
start date:
1391/12/01
Completion Date:
Project Description:
Services of consultant : Base Engineering, Preparation of Bid Documents for Design and Construction and Bidding
Study period: 2010- 2016
Financing of operating costs: Islamic Development Bank loan Tehran
Population and Covering Area : 3150000 thousand people, 20000 Hectare
Maximum flow rate ( year 2031) : 17.22m3 /sec
Length and diameter of the tunnel : 3000 mm, 12 km
Tunnel: Concrete segment with anti-corrosion coating
Mode of operation : Mechanized , TBM Segment Transition
Project Status : Under implementation