Location:
Bojnurd
Activity:
Surveying
Client:
Khorasan Shomali Regional Water Company
start date:
Completion Date:
Project Description:
Objectives: Topographical land surveying of water transmission
route
Activities:
-1:1000 scaled Map preparation and 1 meter contour lines
intervals and 300 meters band width in water transmission route.
-1:500 scaled Map preparation by direct plane surveys and 25
cm contour lines intervals from 4 pump stations and treatment plant locations.
Land features: Plain – hilly- mountainous
Route length:60 km
Area:450 ha.