Real Time Monitoring of Mashhad Water Distribution Network

Real Time Monitoring of Mashhad Water Distribution Network

Location: Mashhad water & wastewater zones 3 and 4

Activity: Water Supply

Client: Mashhad Water & Wastewater Company

start date:

Completion Date:

Project Description:

Services: Feasibility studies

Objective: Computer modeling of water distribution network calibration

No. of Subscribers: 48000

Pipe diameters:  65 – 1000 mm

Study area: 2660 ha

Target: 

Dynamic operation of water distribution networks, application of software and hardware to reduce water loss, instant management, complete recognition of hydraulic conditions and achieve a computerized model of calibration given the network conditions 

Pilot studies achievements:

Discovering high pressurized points

Finding out faulty installations

Pressure management guidelines

Optimizing current network operation through monitoring

Time scheduled development plans for each 5 year period

Qualitative modeling

Status: Under operation since 2004