Location:
Bojnurd, Khorasan Shomali province
Activity:
Sewerage Systems and Environment
Client:
Khorasan Shomali Water & Waste water Company
start date:
Completion Date:
Project Description:
Services:Studies of First and Second Stages and Implementation supervision
Plan duration : First : 2006 End : 2031
Population : First : 178000 End : 219200 people
Population density : First of all,51.5 people per hectare, at the end 88.6 people per hectare
Sewage production per day: first 154 lit/day, end 180 lit/day
Covered area the network (feasibility studies): 2500
hec
Pipes in the collection network (feasibility studies) : 200-1000 mm
Length of the collecting network (development) : 390
km
Pipes used: double – wall corrugated polyethylene
Description of the development plan for the wastewater
treatment plant
Process method: Activated sludge- extended aeration
expandable to complete mix nitrate removal ability for 2 independent operating
periods of 5 years (2006-2011), and 20 years (2011-2031)
Project capacity: The construction of meet the needs
of the first 5 years of the project period (1383- 1383) and its enhancement to
the complete mixing process up to 38500 m3/day capacity for the final
development of the treatment plant by the end of the year plan
Modulation: The total capacity of the treatment plant
is in the form of a modulus and with upgrade conditions for future design
needs.
Design elements: pre-treatment facilities (Rubbing,
Grazing), flow measurement, biological picker (selector),aeration and settling
pools, reciprocating and surplus sludge pump pumping stations, mechanical
sludge dewatering facilities, anaerobic digestion and disinfection facilities
(perchlorin)
Start date of studies: 2001
Start date of Operation: 2011