Asalouye Water Supply

Asalouye Water Supply

Location:

Activity: Water Supply

Client: Pars Energy Specific Economy Region Organization

start date:

Completion Date:

Project Description:

Services: Engineering, Procurement and Construction (EPC)

Objective: Water supply to Bidkhoon and Economic zone

Project components:

 A – Water transmission line

Transfer route: 27km  

Pipe material: Steel and polyethylene

Pipe diameter: Steel 500mm, Polyethylene 630mm

Transfer rate: 30,000 m³ /day

Water resource: Two water desalination stations             

Interior lining: Zinga, 360 micro millimeters thick

Exterior lining:   Primer with glass-wool

B- Distribution network

Transfer route: 38km

Pipe material: Polyethylene

Pipe diameter: 125-900 mm

C- Pump stations

Pumping method: 2 stage, open system

Pumping volume: 10000 m³/d for PS1, 30000 m³/d for PS2

Pumping head: 18 m for PS1, 210m for PS2

No. of pumps: 38 m for PS1, 4 m for PS2

D-Reservoirs

In distribution network:15,000 m³

In transmission line: 2 × 10,000 m³

Status: Under Operation since 2008