Location:
Activity:
Water Supply
Client:
Pars Energy Specific Economy Region Organization
start date:
Completion Date:
Project Description:
Services: Engineering, Procurement and Construction (EPC)
Objective: Water supply to Bidkhoon and Economic zone
Project components:
A – Water transmission line
Transfer route: 27km
Pipe material: Steel and polyethylene
Pipe diameter: Steel 500mm, Polyethylene
630mm
Transfer rate: 30,000 m³ /day
Water resource: Two water desalination
stations
Interior lining: Zinga, 360 micro
millimeters thick
Exterior lining: Primer with glass-wool
B- Distribution network
Transfer route: 38km
Pipe material: Polyethylene
Pipe diameter: 125-900 mm
C- Pump stations
Pumping method: 2 stage, open system
Pumping volume: 10000 m³/d for PS1, 30000
m³/d for PS2
Pumping head: 18 m for PS1, 210m for PS2
No. of pumps: 38 m for PS1, 4 m for PS2
D-Reservoirs
In distribution network:15,000 m³
In transmission line: 2 × 10,000 m³
Status: Under
Operation since 2008