Designing Mastara Dam (Armenia)
Mastara Dam is located about 50 km west of the city of Yereven.The purpose of this project is to supply water shortage for agricultural land in the Hook Tanbiran area.Based on previous studies, a clay core Earth-Dam has been predicted with height of 30 meters and a reservoir volume of 10 million cubic meters.
-
Designing Vedi Dam (Armenia)
The project aims on irrigation of agriculture lands in Vedi and Ararat regions in Armenia.Dam type is Earth-fill with clay core.The height is 85 m from foundation level.The reservoir volume is 29.4 mcm.Feasibility study of the project assigned to Toossab Company.Studying stage starts at 2017.
-
-
Mary City Water Treatment Plant (Turkmenistan)
Design and
supervision on the construction of this project was carried out by Toossab
which started its operation in 1998. The final capacity of this treatment plant
is 110,000 m³/day.
-
Doosti Dam ( Iran and Turkmenistan border)
Along the boundary
line between Iran and Turkmenistan a large earth-fill clay core dam was
constructed on Harrirud River as a joint work of the two countries. This project is under operation since March 2005. The reservoir volume is 1250 MCM at normal water level.Its feasibility study, design, preparation of executive drawings and supervision was assigned to Toossab Consulting Engineers Company.
-
Gambiriy Irrigation Network and Power plant (Afghanistan)
1st and 2nd stages of studies for this project was performed by Toossab which includes irrigation of 12000 ha. of lands along with
transmission of excess water to through a 130 km transmission canal with 100 m3/s capacity, and also powerplant with 50 MW capacity in JalalAbad region.
-
Andkhoy Water Supply Project (Afghanistan)
Study and execution
of this EPC project consisted of pumping water from Amudarya River located
north Afghanistan to Andkhoy town and its neighboring villages. This project
was carried out by a joint venture of Toossab Consulting Engineers Company and
Momtaz Contracting Company. The length of water transmission line in this project is around 120 km.
-
Rehabilitation and Development of Aleppo Sewage Treatment Plant ( Syria)
This project, apart from removing the current operational problems of sewage treatment plant as an emergency plan, includes presentation of technical solutions for expansion of plant capacity up to 600,0000 m3/day in 2020. with regard to the situation in Syria, this project was stopped in 2012 due to the conditions of Syria.
-